The Maynard School – Construction – Storage Shed

As commercial building contractors we were contacted by The Maynard School in Exeter to construct a new outbuilding for the storage of equipment. Our Exeter builders began by clearing the site, our team then levelled and dug out footings, laid the concrete foundation and built a blockwork wall up to the existing adjoining Gym floor level.

We laid a concrete floor, built stud frame walls, erected access scaffolding, cut and fit roof timbers and fitted galvanised floor sheets before going on to clad the outside walls with Marley Cedral cladding, fix a frame and door, insulate between studwork and clad the inside walls with ply. Suspended ceiling installation was required at this point, we then added a stained door and removed the scaffold. The client was delighted with the results of this general building project and incredibly pleased with the additional storage space.